8.15
Mission Analysis
8.15. Mission Analysis Mission success starts with thorough mission analysis. Planning for VFR missions can be time-consuming; it is good technique to start at least one day prior to the mission. Local In-Flight Guides normally contain detailed step-by-step guidance.
p. 159
8.15.1. Choosing a Destination. A leg length of approximately 200 miles provides ample time to practice VFR while allowing time to complete additional training requirements enroute or at the destination.
p. 159
8.15.2. Weather. VFR missions require better weather than IFR missions (See AFMAN 11- 202V3). In general, the minimum weather to takeoff and land under VFR is a 1,500-foot AGL ceiling and 3 statute-mile visibility. Additionally, enroute weather must allow compliance with minimum VFR cloud clearance requirements and completion of the mission at VFR altitudes IAW AFMAN 11-202V3 and AFMAN 11-2T-6V3. If weather does not permit the flight to be completed solely under VFR, a composite flight plan with VFR and IFR portions must be filed.
p. 159